What do we do?

We provide comprehensive steel detailing solutions for fabricators and contractors with speed and precision at very competitive rates.

 

 

Complex facade retention, utilizing external and internal towers and relatively light section sizes.

Engineer: MBP

Client - MBP:

https://www.mbp-uk.com/

  • 2018

Archway Facade Retention

  • 2019

Merton High Street

Steel structure built on RC walls with different levels at each column. Main steel frame and cold formed purlins. Client - SteelBeams Ltd

  • 2019

Abbey Point Cafe

This project included steel frame as well as metal deck. Engineer - Elliott Wood. 

  • 2020

Forest Road

Steel frame supporting new flats in Hackney. Engineer: Fairhurst

 

  • 2022

Laybourne Lake

Unusual pitched roof sloping in both ways. Cold formed purlins

 

Client - SteelBeams Ltd

  • 2022

Wigmore Street

Challenging project in the heart of London. The scheme included new steelwork, jacking of existing columns, and internal temporary towers. 

Engineer - ALPL:

https://www.alcock-lees.co.uk/
 

© Copyright. All rights reserved.

We need your consent to load the translations

We use a third-party service to translate the website content that may collect data about your activity. Please review the details in the privacy policy and accept the service to view the translations.